Safaga 220/66/22/11 kV substation expansion – 66 kV AIS turnkey (excl. main transformers), lowest bidder
توسيع محطة محولات سفاجا 220/66/22/11 ك.ف – معدات 66 ك.ف تقليدية تسليم مفتاح (باستثناء المحولات الرئيسية)، أقل عطاء
Korra–Hidelco lowest at EGP 1.1bn (vs MEGA, EGEMAC) for a turnkey Safaga substation extension; switchgear, protection, cabling and civil subcontractors should approach the alliance.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Egypt · Safaga |
| Client / owner | Egyptian Electricity Transmission Company (EETC) |
| Awarded to | Korra Energy – Hidelco alliance (lowest bidder) |
| Value | EGP 1,099M |
| Announced | 29 Sep 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Electrical & instrumentation (E&I) installation
- Concrete works (in-situ)
- BMS, controls & SCADA
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.