Safaniyah field water injection project – EPC contract signed (Tecnimont project delivery, CCC execution & construction)
مشروع حقن المياه في حقل السفانية – توقيع عقد الهندسة والتوريد والإنشاء (تكنيمونت للتنفيذ وشركة اتحاد المقاولين للإنشاء)
Piping, pipeline, E&I, NDT and valve suppliers should approach Tecnimont/CCC for subcontract packages on Aramco's Safaniyah water injection scheme.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Saudi Arabia · Safaniyah |
| Client / owner | Saudi Aramco |
| Awarded to | Tecnimont / Consolidated Contractors Company (CCC) |
| Announced | 04 Oct 2026 |
| Project type | Oil, gas & petrochemical plants, Pipelines & utility networks |
Trades and packages needed
- Process piping fabrication & welding (main package)
- Mechanical erection & equipment installation (main package)
- Pipeline construction (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Pipes, valves & fittings supply (main package)
- NDT, inspection & certification
- Cathodic protection
- Scaffolding & access
- Heavy lifting, rigging & transport
- Manpower supply
- Camps, temporary facilities & catering
- Industrial blasting, coating & painting
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.