Satara transmission project (TBCB) – 562 ckm lines + 9,000 MVA transformation for 4,500 MW RE/pumped-storage evacuation; SPV transferred
ترسية عقد – India
36-month transmission build now with Adani Energy Solutions – tower, conductor, transformer and substation EPC suppliers can bid for packages.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | India · Satara, Maharashtra |
| Client / owner | PFC Consulting Ltd / Satara Power Transmission Ltd |
| Awarded to | Adani Energy Solutions Ltd |
| Value | INR 47bn (est. project cost) |
| Announced | 07 Oct 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Structural steel fabrication & erection
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- Electrical & instrumentation (E&I) installation
- Heavy lifting, rigging & transport
- Land surveying & geotechnical investigation
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.