Sener/CFE 2027 generation build programme – 140 plants (>28,000 MW) incl. 16 public projects (6 combined-cycle, Puerto Peñasco solar stages 3–4 to 1,000 MW, 8 hydro repowerings) and MXN 223.7bn grid spend to 2030
تأهيل مسبق – Mexico
Mexico expects 140 power plants under construction in 2027 (16 CFE public projects plus mixed-scheme renewables); EPC firms, turbine/solar suppliers and E&I contractors should position for CFE tenders.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Mexico · Nationwide (incl. Puerto Peñasco, Sonora) |
| Client / owner | Secretaría de Energía (Sener) / Comisión Federal de Electricidad (CFE) |
| Announced | 16 Nov 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Electrical & instrumentation (E&I) installation (main package)
- MV/HV substations & transmission lines (main package)
- Solar PV & battery storage
- Process piping fabrication & welding
- Concrete works (in-situ)
- Structural steel fabrication & erection
- Cables, switchgear & electrical materials
What to do
Early stage – get on the client's or bidders' vendor lists now.