Serbia–North Macedonia gas interconnector (1.5 bcm/yr, Vertical Gas Corridor branch) – pipe-laying on Serbian section to start week of 12 Oct, completion targeted Q1 2028
ترسية عقد – Serbia
Pipeline contractors, NDT, coating and line-pipe/valve suppliers should pursue packages on the Serbian section of this regional gas interconnector now entering construction.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Serbia · Southern Serbia (to North Macedonia border) |
| Client / owner | Republic of Serbia – Ministry of Mining and Energy |
| Awarded to | n/d |
| Announced | 06 Oct 2026 |
| Project type | Pipelines & utility networks, Oil, gas & petrochemical plants |
Trades and packages needed
- Pipeline construction (main package)
- Process piping fabrication & welding (main package)
- Earthworks, excavation & site grading (main package)
- NDT, inspection & certification (main package)
- Pipes, valves & fittings supply (main package)
- Cathodic protection
- Steel, rebar & structural sections supply
- Heavy lifting, rigging & transport
- Equipment & crane rental
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.