Sergipe Águas Profundas FPSOs P-87 & P-81 – Petrobras requires 5–7 topside modules to be assembled in Brazil (SBM Offshore local-content negotiation)
تأهيل مسبق – Brazil
Petrobras is pressing SBM to assemble five to seven FPSO modules for P-87 and P-81 in Brazil (first oil 2030–31); Brazilian fabrication yards, piping, E&I and NDT contractors should engage SBM on module packages.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Brazil · Sergipe (offshore) / Brazilian yards |
| Client / owner | Petrobras |
| Parties | SBM Offshore |
| Announced | 05 Oct 2026 |
| Project type | Offshore platforms & marine O&G, Oil, gas & petrochemical plants |
Trades and packages needed
- Offshore & modular fabrication yards (main package)
- Process piping fabrication & welding (main package)
- Structural steel fabrication & erection (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Mechanical erection & equipment installation
- NDT, inspection & certification
- Industrial blasting, coating & painting
- Industrial hot & cold insulation
- Heavy lifting, rigging & transport
- Scaffolding & access
- Manpower supply
What to do
Early stage – get on the client's or bidders' vendor lists now.