SGR Lot 6 Tabora–Kigoma – 411 km electrified mainline (506 km incl. loops/sidings) – USD 1.2bn commercial facility signed (Deutsche Bank / Société Générale syndicate, AfDB guarantee)
تأهيل مسبق – Tanzania
With financing closed, earthworks, ballast/aggregate, sleeper, electrification and camp/logistics subcontractors should position for the Tabora–Kigoma SGR works.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Tanzania · Tabora – Kigoma |
| Client / owner | Tanzania Railways Corporation (TRC) / Government of Tanzania |
| Value | USD 1.2bn (of USD 2.3bn package) |
| Announced | 06 Nov 2026 |
| Project type | Rail & metro |
Trades and packages needed
- Railway track & systems installation (main package)
- Earthworks, excavation & site grading (main package)
- Bridge & flyover construction
- Concrete works (in-situ)
- Storm-water drainage & culverts
- MV/HV substations & transmission lines
- Ready-mix concrete, cement & aggregates
- Steel, rebar & structural sections supply
- Equipment & crane rental
- Camps, temporary facilities & catering
- Construction logistics, freight & customs
What to do
Early stage – get on the client's or bidders' vendor lists now.