Shokeir Wind Energy 900 MW wind farm – financial close (USD 588M debt); 86 x 10.5 MW Goldwind turbines, civil & electrical works by Orascom Construction
مزرعة رياح رأس شقير بقدرة 900 ميجاوات – الإغلاق المالي (دين 588 مليون دولار)، 86 توربين جولدويند وأعمال مدنية وكهربائية لأوراسكوم للإنشاءات
Financial close unlocks full construction of Engie's largest onshore wind farm; foundation concrete, crane and heavy-haul, cabling and substation suppliers should engage Orascom Construction.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Egypt · Ras Shokeir (Gulf of Suez) |
| Client / owner | Shokeir Wind Energy (Engie 35% / Aeolus-Toyota Tsusho 40% / Orascom Construction 25%) |
| Awarded to | Orascom Construction (civil & electrical); Goldwind (turbines) |
| Announced | 15 Nov 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Concrete works (in-situ) (main package)
- Earthworks, excavation & site grading (main package)
- Heavy lifting, rigging & transport (main package)
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Ready-mix concrete, cement & aggregates (main package)
- Rebar cutting, bending & fixing
- Roads, asphalt paving & road marking
- Equipment & crane rental
- Construction logistics, freight & customs
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.