Shuqaiq 3 GW combined-cycle power plant – integrated membrane water treatment plant (desalination, purification, polishing) awarded
محطة الشقيق للدورة المركبة بقدرة 3 جيجاواط – ترسية محطة معالجة مياه متكاملة بالأغشية (تحلية وتنقية وصقل)
Membrane, pump, valve and skid fabricators can target CANNON Artes, which will engineer and supply the water treatment package for SEC's 3 GW Shuqaiq power plant under Orascom/Técnicas Reunidas.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Saudi Arabia · Shuqaiq (Jizan) |
| Client / owner | Saudi Electricity Company (EPC: Orascom Construction and Técnicas Reunidas) |
| Awarded to | CANNON Artes |
| Announced | 03 Nov 2026 |
| Project type | Power plants & renewables, Water, desalination & treatment |
Trades and packages needed
- Water & wastewater treatment equipment (main package)
- HVAC, pumps & mechanical equipment supply (main package)
- Pipes, valves & fittings supply
- Process piping fabrication & welding
- Electrical & instrumentation (E&I) installation
- Mechanical erection & equipment installation
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.