Sidi Ladjel seawater desalination plant, Mostaganem – 300,000 m³/d (first 150,000 m³/d within 22 months): works under way, Sonatrach CEO site visit
محطة سيدي لعجال لتحلية مياه البحر بمستغانم – 300,000 م³/يوم (أول 150,000 م³/يوم خلال 22 شهراً): الأشغال جارية وزيارة الرئيس المدير العام لسوناطراك للموقع
Pumps, RO membranes, valves and E&I suppliers should approach SARPI for remaining packages on the fast-track 300,000 m³/d Mostaganem plant.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Algeria · Mostaganem |
| Client / owner | Sonatrach / Algerian Desalination Company (ADC) |
| Awarded to | SARPI (Société Algérienne de Réalisation de Projets Industriels) |
| Announced | 08 Nov 2026 |
| Project type | Water, desalination & treatment |
Trades and packages needed
- Water & wastewater treatment equipment (main package)
- HVAC, pumps & mechanical equipment supply (main package)
- Pipes, valves & fittings supply (main package)
- Mechanical erection & equipment installation
- Process piping fabrication & welding
- Electrical & instrumentation (E&I) installation
- Concrete works (in-situ)
- Marine works, dredging & reclamation
- Cables, switchgear & electrical materials
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.