Siwa Oasis solar plant battery storage unit (EGP 187.2M; total plant cost raised to EGP 374.4M), 12-month build
وحدة تخزين بالبطاريات لمحطة سيوة للطاقة الشمسية (187.2 مليون جنيه؛ رفع التكلفة الإجمالية إلى 374.4 مليون جنيه) – تنفيذ خلال 12 شهرًا
BESS container, PCS/inverter and cabling suppliers should approach the contractor Ersk for the Siwa storage unit, which is due within 12 months.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Egypt · Siwa Oasis |
| Client / owner | Egyptian Electricity Holding Company |
| Awarded to | Ersk (إيرسك) |
| Value | EGP 187.2M |
| Announced | 10 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines
- Electrical installation (LV)
- Cables, switchgear & electrical materials
- BMS, controls & SCADA
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.