Songyuan integrated green hydrogen-ammonia-methanol project Phase 2 – construction begins (renewables to 1.6 GW, +400,000 t/yr green ammonia, 90,000 t/yr H2)
ترسية عقد – China
USD 1.5bn green ammonia/methanol expansion now under construction – electrolyzer, compressor, pressure vessel, piping and wind/solar BOP suppliers should target CEEC procurement.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | China · Songyuan, Jilin |
| Client / owner | China Energy Engineering Corp. |
| Awarded to | China Energy Engineering Corp. (developer-led) |
| Value | CNY 10.8bn (~USD 1.5bn) |
| Announced | 30 Oct 2026 |
| Project type | Oil, gas & petrochemical plants, Power plants & renewables |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Pressure vessels, tanks & heat exchangers (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Structural steel fabrication & erection
- Concrete works (in-situ)
- Industrial hot & cold insulation
- NDT, inspection & certification
- Heavy lifting, rigging & transport
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.