Spille wind farm 84 MW – Nordex order for 12 N163/6.X turbines (supply, installation, 15-year service)
ترسية عقد – Albania
Heavy-lift, transport/port logistics and BOP civil/electrical contractors in the Balkans should target Nordex and Verbund on Albania's first wind farm (COD spring 2028).
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Albania · Durrës |
| Client / owner | Verbund Green Power |
| Awarded to | Nordex Group |
| Announced | 13 Nov 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Heavy lifting, rigging & transport (main package)
- Equipment & crane rental (main package)
- Construction logistics, freight & customs (main package)
- Concrete works (in-situ)
- MV/HV substations & transmission lines
- Roads, asphalt paving & road marking
- Electrical & instrumentation (E&I) installation
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.