State-owned 1,200 MW gas-fired thermal power plant – deal to be signed before end-2026
تأهيل مسبق – Ghana
Ghana plans its largest thermal addition (1,200 MW gas-fired) with signing targeted before year-end – gas-turbine EPCs, BOP contractors and HV substation suppliers should position early.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Ghana |
| Client / owner | Government of Ghana |
| Announced | 27 Sep 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Electrical & instrumentation (E&I) installation (main package)
- MV/HV substations & transmission lines
- Concrete works (in-situ)
- Structural steel fabrication & erection
- Heavy lifting, rigging & transport
- MEP & process design engineering
What to do
Early stage – get on the client's or bidders' vendor lists now.