State-owned 1,450 MW gas-fired thermal power plant at Ekafudzidzi (construction from Dec 2026; 600 MW by 2028) plus 600 MW solar with 2,000 MWh battery storage – 2027 Budget
تأهيل مسبق – Ghana
Gas turbine EPC contractors, BOP and grid contractors, and solar-plus-storage EPCs should track Ghana's 2027 budget plan for a fully state-funded 1,450 MW gas plant (construction slated from Dec 2026) and a 600 MW/2 GWh solar-storage facility; builder and procurement route not yet stated (updates the earlier 1,200 MW plan).
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Ghana · Ekafudzidzi (Central Region) |
| Client / owner | Government of Ghana – Ministry of Energy and Green Transition |
| Announced | 12 Nov 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Electrical & instrumentation (E&I) installation (main package)
- MV/HV substations & transmission lines (main package)
- Concrete works (in-situ)
- Piling & deep foundations
- Structural steel fabrication & erection
- Solar PV & battery storage
- Heavy lifting, rigging & transport
What to do
Early stage – get on the client's or bidders' vendor lists now.