Syntys 20 MW Tier III AI-ready data centre – groundbreaking at existing Syntys campus
مركز بيانات سينتس بقدرة 20 ميجاواط من الفئة الثالثة الجاهز للذكاء الاصطناعي – وضع حجر الأساس في حرم سينتس القائم
Cooling, UPS/generator, fire-suppression and BMS suppliers should approach Syntys as construction starts on its 20 MW Qatar data centre.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Qatar |
| Client / owner | Syntys (Ooredoo Group) |
| Announced | 12 Nov 2026 |
| Project type | Data centres |
Trades and packages needed
- District cooling & chilled-water plants (main package)
- HVAC & ventilation (main package)
- Generators, UPS & standby power (main package)
- Electrical installation (LV) (main package)
- Fire protection & fire alarm (main package)
- ELV, ICT & security systems (CCTV, access, cabling) (main package)
- BMS, controls & SCADA (main package)
- MV/HV substations & transmission lines
- Cables, switchgear & electrical materials
- HVAC, pumps & mechanical equipment supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.