Taean 504 MW offshore wind farm – subsea cable supply & installation capacity reservation agreement (main contract due end-2026)
تأهيل مسبق – South Korea
Cable capacity reserved ahead of the main contract on a 504 MW Korean offshore wind farm (construction from Q4 2026, COD Q4 2029); marine survey, cable protection and offshore logistics suppliers should approach LS and the developer.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | South Korea · Taean, South Chungcheong |
| Client / owner | Taean Wind Power (CIP / Vena Energy JV) |
| Parties | LS Cable & System and LS Marine Solution (preferred bidders) |
| Announced | 03 Nov 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Marine works, dredging & reclamation (main package)
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Heavy lifting, rigging & transport
- Construction logistics, freight & customs
- Land surveying & geotechnical investigation
What to do
Early stage – get on the client's or bidders' vendor lists now.