Teesworks Dorman Point grid substation (1,440 MVA initial, up to 3.2 GW) – National Grid buys 73.3-acre site, Balfour Beatty to deliver, online by end-2029
ترسية عقد – United Kingdom
Civil, earthworks, steelwork and HV electrical subcontractors should contact Balfour Beatty about packages on what is billed as the UK's largest substation at Teesworks.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | United Kingdom · Teesside |
| Client / owner | National Grid Electricity Transmission |
| Awarded to | Balfour Beatty |
| Announced | 03 Nov 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Earthworks, excavation & site grading
- Concrete works (in-situ)
- Piling & deep foundations
- Structural steel fabrication & erection
- Electrical & instrumentation (E&I) installation
- BMS, controls & SCADA
- Heavy lifting, rigging & transport
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.