TeraFab AI semiconductor fab campus (SpaceX/Tesla/xAI) – up to USD 119bn over 4 phases, Phase 1 USD 16.8bn (2026–28); contractors not yet selected
تأهيل مسبق – United States
County filings show a four-phase, 100M sq ft chip-fab campus with on-site gas turbines, substations and water recycling; Tesla is building an in-house team to write bid packages, so cleanroom, MEP, steel and power contractors should register early.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | United States · Grimes County, Texas |
| Client / owner | TeraFab AI (SpaceX-led, with Tesla and xAI) |
| Value | USD 119.4bn (4 phases; Phase 1 USD 16.8bn) |
| Announced | 08 Oct 2026 |
| Project type | Factories & industrial plants, Power plants & renewables |
Trades and packages needed
- Structural steel fabrication & erection (main package)
- Concrete works (in-situ) (main package)
- HVAC & ventilation (main package)
- Process piping fabrication & welding (main package)
- Electrical & instrumentation (E&I) installation (main package)
- MV/HV substations & transmission lines (main package)
- Water & wastewater treatment equipment
- Generators, UPS & standby power
- Earthworks, excavation & site grading
- Fire protection & fire alarm
- BMS, controls & SCADA
- Project management & construction supervision
What to do
Early stage – get on the client's or bidders' vendor lists now.