Three Aramco offshore EPC projects awarded to NMDC Energy (AED 2.8bn, 18–23 months)
ترسية ثلاثة مشاريع بحرية لأرامكو بنظام الهندسة والتوريد والإنشاء على شركة إن إم دي سي للطاقة (2.8 مليار درهم، 18–23 شهراً)
Fabrication yards, piping, NDT, coating and marine-lift subcontractors and steel suppliers should engage NMDC Energy on its three fast-track Aramco offshore packages.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Saudi Arabia · Arabian Gulf offshore |
| Client / owner | Saudi Aramco |
| Awarded to | NMDC Energy |
| Value | AED 2.8bn |
| Announced | 23 Oct 2026 |
| Project type | Offshore platforms & marine O&G |
Trades and packages needed
- Offshore & modular fabrication yards (main package)
- Process piping fabrication & welding (main package)
- Structural steel fabrication & erection (main package)
- NDT, inspection & certification (main package)
- Heavy lifting, rigging & transport (main package)
- Electrical & instrumentation (E&I) installation
- Industrial blasting, coating & painting
- Pipes, valves & fittings supply
- Steel, rebar & structural sections supply
- Manpower supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.