Trtar-Krtolin wind farm repowering – replace 14 Enercon E-48 turbines (11.2 MW) with up to 5 turbines of up to 6 MW plus 10 MW / 20 MWh BESS, EIA request filed
تأهيل مسبق – Croatia
Wind BOP contractors, heavy-lift firms and BESS integrators in Croatia can track the Trtar-Krtolin repowering near Šibenik ahead of contractor selection.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Croatia · Šibenik |
| Client / owner | Vjetroelektrana Trtar Krtolin d.o.o. |
| Announced | 29 Oct 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Demolition & dismantling (main package)
- Concrete works (in-situ) (main package)
- Heavy lifting, rigging & transport (main package)
- Solar PV & battery storage
- MV/HV substations & transmission lines
- Earthworks, excavation & site grading
- Cables, switchgear & electrical materials
- Equipment & crane rental
What to do
Early stage – get on the client's or bidders' vendor lists now.