Turin–Lyon high-speed line: Susa international station design and build (about 553 m of track, systems, 5-year maintenance)
تأهيل مسبق – Italy
Rail contractors can apply to prequalify for Telt's EUR 155M Susa station design-and-build on the Turin–Lyon line.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – closes 15 Dec 2026 (50 days) |
| Country | Italy · Susa |
| Client / owner | Telt |
| Value | EUR 155M |
| Announced | 18 Oct 2026 |
| Deadline | 15 Dec 2026 |
| Project type | Rail & metro |
Trades and packages needed
- Railway track & systems installation (main package)
- Earthworks, excavation & site grading
- Concrete works (in-situ)
- ELV, ICT & security systems (CCTV, access, cabling)
- Electrical installation (LV)
- Equipment & crane rental
What to do
Early stage – get on the client's or bidders' vendor lists now.