Umm Shaif Long-Term Development Plan 2.1 – two offshore EPC packages: EOI completed, early contractor engagement
خطة التطوير طويلة الأجل لحقل أم الشيف 2.1 – حزمتا هندسة وتوريد وإنشاء بحرية: اكتمال إبداء الاهتمام وبدء التواصل المبكر مع المقاولين
Offshore EPC contractors, fabrication yards and topsides equipment suppliers should position now for ADNOC Offshore's two Umm Shaif LTDP 2.1 packages.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | UAE · Abu Dhabi (offshore) |
| Client / owner | ADNOC Offshore |
| Announced | 21 Oct 2026 |
| Project type | Offshore platforms & marine O&G, Oil, gas & petrochemical plants |
Trades and packages needed
- Offshore & modular fabrication yards (main package)
- Process piping fabrication & welding (main package)
- Mechanical erection & equipment installation (main package)
- Electrical & instrumentation (E&I) installation (main package)
- Heavy lifting, rigging & transport
- NDT, inspection & certification
- Industrial blasting, coating & painting
- Industrial hot & cold insulation
- Pipes, valves & fittings supply
- MEP & process design engineering
What to do
Early stage – get on the client's or bidders' vendor lists now.