Venture Global – GE Vernova & Baker Hughes frame agreements for up to 16 x 720 MW combined-cycle power islands (~11.5 GW) + power transformers; first PO by end-2026
ترسية عقد – United States
Venture Global is lining up turbines for up to 11.5 GW of grid-independent gas power (Louisiana sites, permits being filed); heavy-lift, piping, E&I and HV contractors should track its power-island orders.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | United States |
| Client / owner | Venture Global |
| Awarded to | GE Vernova; Baker Hughes |
| Announced | 15 Oct 2026 |
| Project type | Power plants & renewables, Data centres |
Trades and packages needed
- Concrete works (in-situ) (main package)
- Mechanical erection & equipment installation (main package)
- Process piping fabrication & welding (main package)
- Electrical & instrumentation (E&I) installation (main package)
- MV/HV substations & transmission lines (main package)
- Heavy lifting, rigging & transport (main package)
- Piling & deep foundations
- NDT, inspection & certification
- Industrial hot & cold insulation
- Scaffolding & access
- Manpower supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.