Contract award

Victoria North NT02 (34-storey BTR tower, 316 homes) and NT03 (3 buildings, 579 homes) – main contracts (GBP 225M)

ترسية عقد – United Kingdom

Frame, façade, MEP, lift and fit-out subcontractors: HG starts the 34-storey NT02 tower immediately (completion 2029), with NT03 to follow in early 2027 subject to Gateway 2.

TypeContract award
StatusContract awarded – subcontracting open
CountryUnited Kingdom · Manchester (Red Bank, Victoria North)
Client / ownerFEC (Far East Consortium)
Awarded toHG Construction
ValueGBP 225M
Announced21 Oct 2026
Project typeResidential towers & apartments

Trades and packages needed

What to do

The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.

Read the official source → Report a correction

Related live opportunities

Open tenderArgentinaARS 21bnOpen – closes 26 Oct 2026 (3 days)

New San Martín de los Andes bus terminal on RP 48 (16 bays, 540 days, ARS 21bn) plus paving of Gingins & Torres callejones and two roundabouts on RN 40 – bid openings 26–27 Oct

Client: Province of Neuquén / Municipality of San Martín de los Andes

Open tenderBrazilBRL 72.5MOpen – closes 28 Jan 2027 (97 days)

Portão do Inferno tunnel on MT-251 – 170 m tunnel + accesses (513 m), integrated contract incl. basic & executive design (BRL 72.5M), new edital

Client: Governo de Mato Grosso – Sinfra-MT

Contract awardArgentinaARS 59.1bnContract awarded – subcontracting open

Arroyo Duppy basin storm-drainage works stage 3 – channelling to Matanza River, storm collectors, secondary branches & culverts; LPI 1/2025 (IDB-funded) awarded (ARS 59.1bn)

Awarded to UTE Eleprint S.A. – Briales S.A. – TPS Constructora S.A. · Client: Province of Buenos Aires – Subsecretaría de Recursos Hídricos (IDB Programa de Drenaje y Control de Inundaciones)

Contract awardMalaysiaMYR 568.2MContract awarded – subcontracting open

TNB multi-voltage 500 kV–11 kV transmission & distribution substation at Paka – construction contract (MYR 568.2M)

Awarded to JTHSB-KPMSB-BSB JV (Jati Tinggi, Kerjaya Prospek, Betapac) · Client: Tenaga Nasional Bhd (TNB)

Pre-qualification / EOIMontenegroOpen – deadline not published

Korita wind farm phase 1 (88 MW, 11 turbines + 35/400 kV substation) – construction permit issued

Client: Vjetro park Korita