Vyoma.AI 52 MW AI-ready green data centre (direct-to-chip liquid cooling) at L&T's Chennai AI Factory campus – construction started
ترسية عقد – India
Liquid-cooling, chiller, UPS/genset and MV switchgear suppliers should approach L&T's Vyoma.AI now that its 52 MW Chennai AI data centre is under construction.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | India · Chennai |
| Client / owner | Vyoma.AI (Larsen & Toubro) |
| Announced | 28 Oct 2026 |
| Project type | Data centres |
Trades and packages needed
- Electrical installation (LV) (main package)
- MV/HV substations & transmission lines (main package)
- HVAC & ventilation (main package)
- District cooling & chilled-water plants (main package)
- Generators, UPS & standby power (main package)
- Fire protection & fire alarm
- ELV, ICT & security systems (CCTV, access, cabling)
- BMS, controls & SCADA
- HVAC, pumps & mechanical equipment supply
- Cables, switchgear & electrical materials
- Concrete works (in-situ)
- Structural steel fabrication & erection
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.