Warradarge wind farm hybrid addition – 500 MW solar + 500 MW battery storage, AUD 2bn – planning proposal lodged
تأهيل مسبق – Australia
Solar and BESS EPCs, inverter and battery suppliers should register interest with Synergy as this AUD 2bn hybrid moves through WA planning.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Australia · Coorow (Mid-West, WA) |
| Client / owner | Synergy (SynergyRed) / Bright Energy Investments |
| Value | AUD 2bn |
| Announced | 05 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Electrical installation (LV)
- Cables, switchgear & electrical materials
- Earthworks, excavation & site grading
What to do
Early stage – get on the client's or bidders' vendor lists now.