Wasel Al-Haram park-and-ride transport PPP – 19 stations and car parks on 7 corridors (3.1M m²) plus 3,200-bus fleet; Packages 1 & 3 to Alqaid–Moventis–Waskita, Package 2 to Mawgif consortium
مشروع واصل الحرم للنقل بنظام الشراكة مع القطاع الخاص – 19 محطة ومواقف سيارات على 7 محاور (3.1 مليون م²) وأسطول 3,200 حافلة؛ الحزمتان 1 و3 لتحالف القائد–موفنتس–واسكيتا والحزمة 2 لتحالف موقف
Civil, paving, shade-structure, lighting and ITS subcontractors should approach the two Makkah PPP consortia now packaging construction of the 19 park-and-ride stations and car parks.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Saudi Arabia · Makkah |
| Client / owner | General Transport Center – Royal Commission for Makkah City and Holy Sites |
| Awarded to | Saudi Alqaid Co. / Moventis / Waskita consortium (Pkg 1 & 3); Mawgif consortium (Pkg 2) |
| Value | USD 1.51B |
| Announced | 09 Nov 2026 |
| Project type | Roads & highways, Warehouses & logistics parks |
Trades and packages needed
- Earthworks, excavation & site grading (main package)
- Concrete works (in-situ) (main package)
- Roads, asphalt paving & road marking (main package)
- Structural steel fabrication & erection
- Pre-engineered & modular buildings
- Roofing & sheeting
- Street, area & sports lighting
- ELV, ICT & security systems (CCTV, access, cabling)
- Electrical installation (LV)
- Storm-water drainage & culverts
- Signage & wayfinding
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.