Whyalla West renewable land release – ~13 GW wind & solar proposals selected for feasibility licences (Windlab 6 GW, Altra 4.7 GW, Heron 1.6 GW, Neoen 360 MW)
تأهيل مسبق – Australia
Surveyors, environmental and grid-connection consultants: four developers won exclusive rights to seek feasibility licences for ~13 GW of wind, solar and storage west of Whyalla, with Windlab's first 0.6–1 GW stage targeted for the early 2030s.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Australia · Whyalla, South Australia |
| Client / owner | Government of South Australia |
| Parties | Windlab; Altra Energy; Heron Energy; Neoen (developers) |
| Announced | 18 Oct 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Land surveying & geotechnical investigation (main package)
- MEP & process design engineering
- Structural & civil design
- Solar PV & battery storage
- MV/HV substations & transmission lines
What to do
Early stage – get on the client's or bidders' vendor lists now.