1614 live leads · 54 new today · updated 22 Oct 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today › Australia

Pre-qualification / EOI

Whyalla West renewable land release – ~13 GW wind & solar proposals selected for feasibility licences (Windlab 6 GW, Altra 4.7 GW, Heron 1.6 GW, Neoen 360 MW)

تأهيل مسبق – Australia

Surveyors, environmental and grid-connection consultants: four developers won exclusive rights to seek feasibility licences for ~13 GW of wind, solar and storage west of Whyalla, with Windlab's first 0.6–1 GW stage targeted for the early 2030s.

TypePre-qualification / EOI
StatusOpen – deadline not published
CountryAustralia · Whyalla, South Australia
Client / ownerGovernment of South Australia
PartiesWindlab; Altra Energy; Heron Energy; Neoen (developers)
Announced18 Oct 2026
Project typePower plants & renewables, Substations & transmission grids

Trades and packages needed

What to do

Early stage – get on the client's or bidders' vendor lists now.

Read the official source → Report a correction

Related live opportunities

Pre-qualification / EOITanzaniaOpen – deadline not published

Mtwara–Songea–Mbamba Bay railway (+ Mchuchuma/Liganga branches) – TRC MoU with Arab Contractors for feasibility studies

Client: Tanzania Railways Corporation (TRC)

Contract awardOman · عُمانContract awarded – subcontracting open

Al Kamil I 500 MW solar PV plant – detailed engineering design & initial site studies

Awarded to IDOM · Client: Shanxi Installation Group (EPC contractor)

Contract awardQatar · قطرQAR 191.88M (USD 52.7M)Contract awarded – subcontracting open

Ashghal call-off design consultancy framework for roads & infrastructure projects (PWA/GTC/007/2026)

Awarded to ITAL Consult · Client: Public Works Authority (Ashghal)

Contract awardEgypt · مصرContract awarded – subcontracting open

Eastern Mediterranean ocean-bottom-node seismic survey – phase 1 of 18,000 km² (of 95,000 km² seven-year programme) by SLB–Viridien consortium for EGAS

Awarded to SLB / Viridien consortium · Client: Egyptian Natural Gas Holding Company (EGAS)

Pre-qualification / EOIColombiaCOP 220bnOpen – deadline not published

Variante de Sogamoso recovery – topographic & technical studies to structure final designs; COP 220bn sought for 2027 works

Client: Instituto Nacional de Vías (Invías)

Want more leads like this?Get Land surveying & geotechnical investigation, MEP & process design engineering opportunities in your inbox every morning.
Get free alerts →