Chile construction tenders & contract awards

24 live construction, infrastructure and oil & gas tenders and contract awards in Chile, updated daily.

Get these every morning – free.New Chile leads, straight to your email or WhatsApp.
Register free →
Contract awardChileUSD 28.6MContract awarded – subcontracting open

Coordinador Eléctrico Nacional urgent new-works process – Punilla substation (Transemel) and Quinchamalí substation (Transelec), Ñuble; part of 19 transmission works / USD 508M awarded in 2026

Awarded to Transemel (Punilla); Transelec (Quinchamalí) · Client: Coordinador Eléctrico Nacional (CEN) / Ministerio de Energía, Chile

Contract awardChileUSD 227MContract awarded – subcontracting open

Port of San Antonio – DP World concession (berths 4–7, Costanera wharf) extended 10 years to 2041 in exchange for USD 227M investment plan (+300,000 TEU and +1.8 Mt bulk capacity within 3 years)

Awarded to DP World San Antonio · Client: Empresa Portuaria San Antonio

Pre-qualification / EOIChileCLP 37,500M (~USD 40M)Open – deadline not published

Puente Chacao – Registro Especial Internacional REI-OyM prequalification for 5-year operation & integral maintenance contract (lighting, dehumidification, SHM/monitoring, electrical, access control); bases approved, 120-day registry

Client: Ministerio de Obras Públicas – Dirección de Vialidad

Open tenderChileCLP 1,389M (~USD 1.5M)Open – deadline not published

Costanera de Los Molinos waterfront conservation works – lighting replacement, accessible railings, street furniture, full paving renewal (8 months; award expected mid-Dec 2026)

Client: MOP Los Ríos – Dirección de Obras Portuarias (DOP)

Contract awardChileUSD 475MContract awarded – subcontracting open

Coordinador Eléctrico Nacional transmission tender – 17 expansion-plan projects (10 groups) awarded to Celeo, Engie, Transemel, Alupar, Cox Chile and Ferrovial; incl. Celeo's 6 new substations + two 2x66 kV lines

Awarded to Celeo (3 groups, ~USD 200M); Engie (3); Transemel (1); Alupar (1); Cox Chile (1); Ferrovial (1) · Client: Coordinador Eléctrico Nacional (CEN)

Pre-qualification / EOIChileUSD 321MOpen – deadline not published

MOP flood-damage reconstruction programme – 166 works (~USD 321M): road repairs (44 intermediate-damage Vialidad contracts by direct invitation), river channelling, rural sanitation, coves/ports, studies & designs for 8+ bridges

Client: Ministerio de Obras Públicas (MOP) Chile

Pre-qualification / EOIChileUSD 4,450MOpen – deadline not published

Puerto Exterior de San Antonio (USD 4,450M) – ~4 km state-funded breakwater, two 1,730 m terminals, dredging, rail/road access; environmental approval cleared by Comité de Ministros

Client: Empresa Portuaria San Antonio (EPSA)

Contract awardChileContract awarded – subcontracting open

Echeverría Izquierdo Edificaciones wins six contracts (~UF 4.5M): Edificio Luz & San Pascual mixed-use, La Pastora & San Sebastián offices, Vitacura tower, Mall Plaza El Trébol boulevard, Metro Line 7 Section 1 recovery works

Awarded to Echeverría Izquierdo Edificaciones · Client: FFV; Claudio Fischer; Indesa; Mall Plaza; Metro de Santiago

Contract awardChileContract awarded – subcontracting open

Santiago–Melipilla & Batuco rail services – 5G-ready private 4G network on 87 km plus RTP-800 radios for 32 trains (ETCS Level 2, PIS, PA, CCTV)

Awarded to Teltronic (selected by Siemens Mobility) · Client: EFE (Empresa de los Ferrocarriles del Estado) / Siemens Mobility

Contract awardChileCLP 103MContract awarded – subcontracting open

Peñasmó rural sanitation borehole (Calbuco) – first award under Plan Chile Despega

Awarded to n/d (not named) · Client: MOP – Dirección de Obras Hidráulicas

Pre-qualification / EOIChileUSD 870MOpen – deadline not published

Tovaku copper cathode project (Codelco–Pucobre, 46,000 t/y) – mine & SX-EW plant, 193 MW solar + BESS, 72.5 km seawater pipeline, 27 km 220 kV line – environmental approval (USD 870M)

Client: Minera Puntilla (Codelco / Pucobre)

Contract awardChileCLP 67,598MContract awarded – subcontracting open

Ruta 5 urban crossing Arica, Sector C (Rotonda Arenas–south urban limit, ~2.5 km) – 3 grade separations, new Saucache bridge over San José river, 4 footbridges; preliminary works start (CLP 67,598M)

Awarded to Flesan S.A. · Client: Ministerio de Obras Públicas (MOP) – Dirección de Vialidad

Open tenderChileCLP 3bnOpen – deadline not published

Ruta D-713 paving (conservation), El Divisadero–Altar Alto, 10.48 km incl. 2,729 m lined gutters & 820 m guardrail – tender launched, offers expected Nov (CLP ~3bn)

Client: Ministerio de Obras Públicas (MOP) – Dirección de Vialidad, Coquimbo

Open tenderChileUSD 13.7MOpen – deadline not published

Transemel international tender – four HV substation works: Las Delicias 220 kV & Celulosa Pacífico 220 kV expansions, Cóndores 110 kV expansion, Sur substation 110 kV line bay (USD 13.7M ref.)

Client: Empresa de Transmisión Eléctrica Transemel S.A. (REN group)

Open tenderChileCLP 38,272MOpen – closes 23 Nov 2026 (4 days)

Serviu Biobío tenders completion of stalled works – Paso Sobre Nivel Esmeralda, Concepción (CLP 30,452M, offers 23 Nov) and Enlace Perales Tramo 1A, Talcahuano (CLP 7,820M, offers 9 Nov) after Tapusa exit

Client: Serviu Biobío (MINVU)

Open tenderChileCLP 21,000M (~USD 22M)Open – deadline not published

Chillán storm-water master plan stage 5 – 1,874 m reinforced-concrete underground collector (Av. Ecuador) + 2.8 km Canal Defensa Norte upgrade with 9 hydraulic structures (~CLP 21bn, award planned Dec)

Client: Ministerio de Obras Públicas – Dirección de Obras Hidráulicas (DOH)

Pre-qualification / EOIChileUSD 200MOpen – deadline not published

Google data center Cerrillos – SEA rules no environmental assessment needed; 23 ha, 32,412 m² built, 4 stages, 44 backup gensets (120 MW), 110 kV line, air cooling (USD 200M)

Client: Google

Contract awardChileCLP 4,700M (~USD 5M)Contract awarded – subcontracting open

Paso Cardenal Samoré Vialidad camp replacement – design completion and construction awarded to Constructora Pehuén (CLP 4,700M; works Dec 2026–Dec 2027)

Awarded to Constructora Pehuén · Client: Ministerio de Obras Públicas – Dirección de Vialidad

Pre-qualification / EOIChileUSD 220MOpen – deadline not published

Ceibo 250 MW solar PV project (Atacama) – environmental approval granted, construction start planned July 2027

Client: Orion Power

Pre-qualification / EOIChileUSD 4,853MOpen – deadline not published

MOP 2026 concessions pipeline (USD 4.85bn, 12 projects) – Ruta 5 Collipulli–Temuco, Ruta 57 Santiago–Los Andes, Accesos a Valdivia, Calama prison and Alto Hospicio–Iquique cable car still in tender; 7 others postponed

Client: Ministerio de Obras Públicas – Dirección General de Concesiones

Open tenderChileUSD 35MOpen – deadline not published

MOP Plan Chile Despega – 13 prioritised Valparaíso works (road connectivity Algarrobo, Cartagena, Los Andes; coastal works El Quisco, Los Molles, Juan Fernández), several in tender

Client: Ministerio de Obras Públicas (MOP) Chile

Pre-qualification / EOIChileUSD 725MOpen – deadline not published

Sierra Gorda copper mine fourth grinding line (48→60 Mt/y, extra crushing & flotation) – USD 725M brownfield expansion, key contracts not yet disclosed

Client: Sierra Gorda SCM (KGHM 55% / South32 45%)

Pre-qualification / EOIChileUSD 400MOpen – deadline not published

Plan Chile Despega – 241 MOP works contracts (roads, bridges, piers, aerodromes, rural water plants) being tendered, awards by end-2026

Client: Ministerio de Obras Públicas (MOP)

Pre-qualification / EOIChileOpen – deadline not published

Giant Magellan Telescope – general contractor for 22-storey rotating telescope enclosure (industry meeting Nov 2026, RFQ early 2027)

Client: Giant Magellan Telescope Organization (GMTO)