A2 motorway Biała Podlaska – Kijowiec (16 km, dual 2-lane with reserve for 3rd lane) – design & build contract signed with Mirbud/Budpol
ترسية عقد – Poland
Earthworks, asphalt, bridge, drainage and lighting subcontractors and aggregate/RMC suppliers should approach Mirbud/Budpol on this 16 km A2 section closing the gap to the Belarus border.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Poland · Biała Podlaska |
| Client / owner | GDDKiA (General Directorate for National Roads and Motorways) |
| Awarded to | Mirbud and Budpol consortium |
| Value | PLN 571M |
| Announced | 03 Nov 2026 |
| Project type | Roads & highways, Bridges & tunnels |
Trades and packages needed
- Roads, asphalt paving & road marking (main package)
- Earthworks, excavation & site grading (main package)
- Bridge & flyover construction (main package)
- Storm-water drainage & culverts (main package)
- Ready-mix concrete, cement & aggregates (main package)
- Precast & prestressed concrete
- Street, area & sports lighting
- Equipment & crane rental
- Site security & traffic management
- Structural & civil design
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.