2780 live leads · 55 new today · updated 19 Nov 2026Contactمناقصات يومية مجانية
Tender Leads DailyConstruction tenders & awards · every morning

Today › Iraq

Pre-qualification / EOI

Al-Faw refinery – USD 7–8bn project, progress held up by financing

مصفاة الفاو – مشروع بقيمة 7 إلى 8 مليارات دولار يتعثر تقدمه بسبب التمويل

Multi-billion Iraqi refinery still seeking financing – EPC and process licensors should watch for funding close before bidding.

TypePre-qualification / EOI
StatusOpen – deadline not published
CountryIraq · Basra (Al-Faw)
Client / ownerGovernment of Iraq
ValueUSD 7-8bn
Announced02 Oct 2026
Project typeOil, gas & petrochemical plants

Trades and packages needed

What to do

Early stage – get on the client's or bidders' vendor lists now.

Read the official source → Report a correction

Related live opportunities

Pre-qualification / EOIIndiaINR 800 billionOpen – deadline not published

Hindustan Zinc capacity doubling – refined zinc to 2 Mtpa and silver to 1,500 tpa with mine, mill and smelter expansions plus Zinc Industrial Park, Bhilwara

Client: Hindustan Zinc Ltd (Vedanta Group)

Contract awardAlgeria · الجزائرContract awarded – subcontracting open

Menzel Ledjmet Nord gas field development – contract won by Indonesian contractor

Awarded to Indonesian contractor (not named in public summary) · Client: Not disclosed in public summary

Open tenderSaudi Arabia · السعوديةOpen – closes 16 Jan 2027 (58 days)

Ministry of Interior – 132/13.8 kV main substation, source expansion and connection works for the Security Medical Complex (Etimad 260639007989, competition 61/26/53/1)

Client: Ministry of Interior – General Secretariat

Pre-qualification / EOIEthiopiaOpen – closes 02 Dec 2026 (13 days)

Feasibility study and detailed design for Weito pumped small-scale irrigation scheme (100 ha), Kolango-Zuriya Woreda, ET-SE-RPCU-571071-CS-QCBS (World Bank EOI)

Client: Lowlands Livelihood Resilience Project, Phase Two (LLRP II) – South Ethiopia Irrigation and Lowlands Development Bureau

Contract awardGuyanaContract awarded – subcontracting open

Longtail development – FPSO construct & install (250,000 bpd condensate, 1.2 bcf/d gas, ~2M bbl storage, spread-moored ~1,750 m), Fast4Ward hull

Awarded to SBM Offshore · Client: ExxonMobil Guyana Limited

Want more leads like this?Get MEP & process design engineering, Mechanical erection & equipment installation opportunities in your inbox every morning.
Get free alerts →