Contract awardIraq · العراقContract awarded – subcontracting open

Mövenpick Gomaspan resort at Gomaspan Dam – foundation stone laid, construction started (private-sector investment)

Client: Private-sector developer (Mövenpick / Accor brand)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Al-Shihabi 1,000 MW hybrid project (500 MW wind + 500 MWac solar) on 11,470 dunams, Wasit – Seraco proposal reviewed by NIC; turnkey EPC by China Energy International Group with SWEPDI

Client: Seraco / National Investment Commission (Iraq)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

New Baghdad International Airport – 20 million passenger/year airport on ~20,000 dunams planned under an investment model

Client: National Investment Commission (NIC), Iraq

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Iraq–Saudi Arabia (IPSA) crude export pipeline revival – 1,568 km Zubair–Yanbu line, Saudi preliminary approval; Iraq to fund restoration of its section

Client: Iraq Ministry of Oil

Contract awardIraq · العراقContract awarded – subcontracting open

120-bed specialist European hospital in central Baghdad (five operating theatres, cardiac, oncology, neonatal, MRI/CT radiology) – contract signed with 3H Group (GKSD Holding)

Awarded to 3H Group (Hospital Healthcare Holdings, GKSD Holding) · Client: National Investment Commission (Iraq)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

National south–north LPG pipeline – Ministry of Oil orders feasibility study

Client: Ministry of Oil, Iraq

Contract awardIraq · العراقContract awarded – subcontracting open

Rataj Baghdad health and education complex on 70,000 m² site – addiction hospital, autism centre, 100-bed general hospital, two schools and scout camp (investment contract signed at NIC)

Awarded to Abraj Al-Rataj for Investment and Real Estate Development (Al-Kamil Holding Group) · Client: National Investment Commission (Iraq)

Contract awardIraq · العراقContract awarded – subcontracting open

West Qurna-1 Gas Compressor Station 6 – detailed engineering design for low-pressure associated-gas capture (flare reduction)

Awarded to KBR · Client: Basra Gas Company / AKT (Abraj Al-Kut Oil Services) EPC

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Baghdad water and sewage projects – new World Bank financing under discussion (Ministry of Planning & Baghdad Municipality)

Client: Baghdad Municipality (Amanat Baghdad) / Ministry of Planning

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Basra–Haditha crude export pipeline – trilateral Iraq–Jordan–Egypt technical talks on diameter, capacity, branches and export routes, plus proposed joint petrochemical complex and storage

Client: Iraq Ministry of Oil (with Jordan and Egypt)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Associated-gas flaring capture & utilisation at Iraqi oil production sites (gas-to-power, carbon credits MRV) – MoU signed

Client: General Company for Carbon Economics (GCCE), Iraq

Pre-qualification / EOIIraq · العراقOpen – deadline not published

UEG (Kuwait Energy) Block 9 Faihaa and Siba gas field development plans and Fao exploration project – work programmes reviewed with Ministry of Oil

Client: United Energy Group (Kuwait Energy) / Iraq Ministry of Oil

Pre-qualification / EOIIraq · العراقOpen – deadline not published

DNO Kurdistan drilling expansion – eight-well programme with second rig; third large rig under consideration for 2027

Client: DNO ASA

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Iraq gas-flaring elimination programme – new free and associated gas projects at Nasiriyah field and four exploration blocks with Chevron, ExxonMobil and HKN (zero flaring by early 2029)

Client: Iraq Ministry of Oil

Contract awardIraq · العراقContract awarded – subcontracting open

Motorplex Iraq, Zakho – 225,000 m² automotive complex (driving-test track, off-road/4x4 tracks, karting circuit, drift arena, car museum, events venue): foundation stone laid

Client: Harlem Group / Muhanad Group

Contract awardIraq · العراقUSD 5.66bnContract awarded – subcontracting open

Common Seawater Supply Project (CSSP) phase 1 – 5M b/d oilfield water-injection pipelines & treatment plant: early groundworks under way, pipe-laying from 2027

Awarded to China Petroleum Pipeline Engineering (pipelines, USD 2.5bn); Hyundai E&C (treatment plant, USD 3.16bn) · Client: Basra Oil Company / TotalEnergies (with QatarEnergy); PMC: ILF

Contract awardIraq · العراقUSD 930MContract awarded – subcontracting open

Mawten Basra residential city – five-phase housing development (IQD 1.4trn) – NIC investment licence granted

Awarded to Al-Mawj Company for Investment and Real Estate Development · Client: National Investment Commission (NIC)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

First automotive manufacturing plant in Kurdistan Region – Harlem Group / Jetour International contract for 1,000+ dunam car factory in Zakho

Client: Harlem Group

Pre-qualification / EOIIraq · العراقOpen – deadline not published

West Qurna 2 supergiant oilfield – Chevron secures 1-year exclusive negotiation to take over operatorship from Lukoil (USD 200M signing-bonus advance)

Client: Iraq Ministry of Oil

Contract awardIraq · العراقContract awarded – subcontracting open

Two 125 MW combined-cycle units at South Baghdad gas power station and Khor al-Zubair – under construction by Dongfang Electric, service targeted before summer 2027

Awarded to Dongfang Electric · Client: Ministry of Electricity, Iraq

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Southern Iraq seawater injection project Phase 2 (2.5M bpd) – MoU signed by ExxonMobil and Basra Oil Company

Client: Basra Oil Company

Contract awardIraq · العراقContract awarded – subcontracting open

Ratawi field upstream works, Gas Growth Integrated Project (USD 27bn programme) – Enka mobilises workforce on site

Awarded to Enka · Client: Gas Growth Integrated Project (GGIP), Iraq

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Iraq strategic LPG storage – 16 new LPG tanks, 48,000 m³ combined capacity (Ministry of Oil review; SCOP coordinating)

Client: Ministry of Oil (Iraq) – General Company for Gas Filling and Services / State Company for Oil Projects (SCOP)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Baghdad Tigris river taxi – National Investment Commission preparing investment file (river channel works, tourism-style stations, kiosks & accessibility)

Client: National Investment Commission (NIC), Iraq

Contract awardIraq · العراقUSD 800MContract awarded – subcontracting open

Al-Diwaniyah oil refinery expansion (USD 800M) – construction progressing under Al-Barham Group

Awarded to Al-Barham Group · Client: Not named in public teaser (Diwaniyah refinery expansion)

Pre-qualification / EOIIraq · العراقUSD 250MOpen – deadline not published

Kempinski-managed integrated hotel complex (rooms, villas, apartments, conference & events facilities on 20–30 dunams) – USD 250M investment proposal to NIC

Client: Jawad al-Qassab investment group / National Investment Commission (NIC)

Contract awardIraq · العراقContract awarded – subcontracting open

Kirkuk, Bai Hassan, Khabbaz & Jambur fields – operations handed to BP-led joint operating body; targets 450,000 bpd and 500 MMscfd gas capture

Awarded to BP-led joint operating body · Client: Iraq Ministry of Oil (North Oil Company / North Gas Company)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Mosul International Airport – government invitation to airport operators/investors to develop and manage the airport

Client: Government of Iraq (Prime Minister's Office)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Najaf solar PV plant – 1,000 MW with ~30% battery storage (study to expand to 2,000 MW): Ministry of Electricity asks ACWA Power to expedite commercial offer

Client: Iraq Ministry of Electricity

Contract awardIraq · العراقContract awarded – subcontracting open

2D & 3D seismic surveys of Sasan and Alan exploration blocks – contract signed (Iraq Oil Exploration Company & KAR Group)

Client: Iraq Oil Exploration Company / KAR Group

Contract awardIraq · العراقContract awarded – subcontracting open

Budoor Baghdad Residential City – investment contract signed with NIC

Awarded to Darb Al-Kurama General Contracting and Trading Co. · Client: National Investment Commission (NIC), Iraq

Contract awardIraq · العراقContract awarded – subcontracting open

Abraaj Al-Ameriya residential project – 1,620 housing units behind American University of Baghdad, investment contract signed (licence 496/2025)

Awarded to Al-Ab'ad Al-Dhahabiya for Investment and Real Estate Development (Al-Kamil Holding Group) · Client: National Investment Commission (NIC), Iraq

Contract awardIraq · العراقContract awarded – subcontracting open

Three 400 kV substations (Al-Dhafaf Karbala, Al-Abbasiya Najaf, Al-Karkh Baghdad) – Siemens phase-two works under review against contract schedule

Awarded to Siemens · Client: General Company for Electricity Transmission – Middle Euphrates (Ministry of Electricity)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Qayyarah refinery (70,000 bpd) – project given regional approval

Client: Not disclosed

Pre-qualification / EOIIraq · العراقUSD 900MOpen – deadline not published

Iraq Transport Economic Corridors (ITREC) – General Procurement Notice: greenfield first 100 km of Expressway 2 Baghdad–Samarra (~USD 726M, output & performance-based contract), 84 km E1-R9B rehabilitation + 5-yr maintenance (~USD 30M), ~72 km Kurdistan roads incl. Girsheen Interchange (~USD 77.65M); prequalification expected for major works

Client: Iraq Transport Economic Corridors Project (ITREC) – Roads & Bridges Directorate, Ministry of Construction, Housing & Public Municipalities

Pre-qualification / EOIIraq · العراقOpen – deadline not published

North Oil Company associated-gas capture (+80 MMscfd from Bai Hassan, North Jambur, Khabbaz), North Gas Company facility expansion and planned 400 MW gas-fired power station – zero-flaring target end-2027

Client: Ministry of Oil – North Oil Company / North Gas Company

Contract awardIraq · العراقContract awarded – subcontracting open

Ali Al-Wardi Residential City (Madinat al-Ward) – Phase 1 construction contract

Awarded to CRC Dorra (Dorra Group) · Client: ORA Iraq (ORA Developers)

Contract awardIraq · العراقUSD 0.53MContract awarded – subcontracting open

Rehabilitation of 42 category III housing units, Sinjar District

Awarded to Alshiaar Company for Trading and General Contracting Ltd. · Client: UNOPS

Pre-qualification / EOIIraq · العراقUSD 7-8bnOpen – deadline not published

Al-Faw refinery – USD 7–8bn project, progress held up by financing

Client: Government of Iraq

Contract awardIraq · العراقContract awarded – subcontracting open

Madinat Al Ward Phase 1 – construction works contract (after POWERCHINA earthworks)

Awarded to CRC Dorra (Dorra Group) · Client: ORA Iraq

Pre-qualification / EOIIraq · العراقOpen – deadline not published

High-tech electrical equipment manufacturing plant – talks with Main Power Engineering

Client: National Investment Commission (NIC)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

60,000 serviced residential plots – four investment licences (1M-plot national programme)

Client: National Investment Commission (NIC)

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Pipe manufacturing complex planned for Basra (oil, gas & water pipe)

Client: National Investment Commission

Contract awardIraq · العراقContract awarded – subcontracting open

TotalEnergies GGIP – AGUP phase 2 marine warranty survey awarded (Sinopec EPC)

Awarded to New Wave Offshore Energy · Client: Sinopec / TotalEnergies / Basra Oil Co.

Pre-qualification / EOIIraq · العراقOpen – deadline not published

Nahr Bin Umar field – associated-gas investment plans under review

Client: Iraq Ministry of Oil