Al Maktoum International Airport West Terminal (7-level) – substructure works, first phase of USD 35bn expansion
مطار آل مكتوم الدولي – أعمال البنية السفلية للمبنى الغربي (7 طوابق) ضمن المرحلة الأولى من توسعة بقيمة 35 مليار دولار
Piling, dewatering, formwork, rebar, ready-mix and waterproofing suppliers should approach the CCECC–Tristar JV for subcontract packages on the AED 10bn West Terminal substructure.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | UAE · Dubai |
| Client / owner | Dubai Aviation Engineering Projects (DAEP) |
| Awarded to | CCECC / Tristar Engineering & Construction JV |
| Value | AED 10bn (USD 2.7bn) |
| Announced | 01 Nov 2026 |
| Project type | Airports |
Trades and packages needed
- Earthworks, excavation & site grading (main package)
- Dewatering (main package)
- Piling & deep foundations (main package)
- Concrete works (in-situ) (main package)
- Formwork & falsework (main package)
- Rebar cutting, bending & fixing (main package)
- Waterproofing (main package)
- Ready-mix concrete, cement & aggregates (main package)
- Steel, rebar & structural sections supply (main package)
- Ground improvement, grouting & shoring
- Equipment & crane rental
- Scaffolding & access
- Water, sewer & utility networks (incl. HDD)
- Materials testing & QA/QC laboratory
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.