Al-Shihabi 1,000 MW hybrid project (500 MW wind + 500 MWac solar) on 11,470 dunams, Wasit – Seraco proposal reviewed by NIC; turnkey EPC by China Energy International Group with SWEPDI
مشروع الشهابي الهجين بقدرة 1000 ميغاواط (500 ميغاواط رياح و500 ميغاواط شمسية) في واسط – مراجعة هيئة الاستثمار لعرض سيراكو مع تنفيذ هندسي وتوريد وإنشاء من مجموعة الطاقة الصينية
Large wind-solar hybrid in Wasit with a Chinese EPC lined up; turbine foundation, PV mounting, MV/HV cable and substation subcontractors should engage China Energy as approvals progress.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Iraq · Al-Shihabi, Wasit |
| Client / owner | Seraco / National Investment Commission (Iraq) |
| Parties | China Energy International Group; Southwest Electric Power Design Institute |
| Announced | 17 Nov 2026 |
| Project type | Power plants & renewables, Substations & transmission grids |
Trades and packages needed
- Solar PV & battery storage (main package)
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Heavy lifting, rigging & transport
- Concrete works (in-situ)
- Piling & deep foundations
- Earthworks, excavation & site grading
- Electrical installation (LV)
What to do
Early stage – get on the client's or bidders' vendor lists now.