Aphrodite (Cyprus) gas field tie-in to Egyptian infrastructure – long-lead equipment procurement decision then FID being prepared
ربط حقل أفروديت القبرصي للغاز بالبنية التحتية المصرية – التحضير لقرار شراء المعدات طويلة التوريد ثم قرار الاستثمار النهائي
Subsea pipeline, long-lead equipment and Egyptian processing-plant contractors should position with Chevron/EGAS ahead of Aphrodite procurement and FID.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Egypt · Idku / Damietta (East Med) |
| Client / owner | Chevron / EGAS (Ministry of Petroleum and Mineral Resources) |
| Announced | 08 Oct 2026 |
| Project type | Offshore platforms & marine O&G, Pipelines & utility networks, Oil, gas & petrochemical plants |
Trades and packages needed
- Pipeline construction (main package)
- Offshore & modular fabrication yards
- Process piping fabrication & welding
- Cathodic protection
- Pipes, valves & fittings supply
- Mechanical erection & equipment installation
What to do
Early stage – get on the client's or bidders' vendor lists now.