Today › Saudi Arabia

Pre-qualification / EOI

Aramco Al Hadha gas processing plant expansion – three EPC packages (gas treatment trains/AGRU/TEG, sulphur recovery, utilities & infrastructure) expected to be tendered by Dec 2026

توسعة معمل الحضا لمعالجة الغاز التابع لأرامكو – ثلاث حزم هندسة وتوريد وإنشاء متوقع طرحها بحلول ديسمبر 2026

EPC contractors and process equipment vendors should position now for Aramco's three Al Hadha gas plant EPC packages expected by December.

TypePre-qualification / EOI
StatusOpen – deadline not published
CountrySaudi Arabia · Al Hadha (~85 km NW of Jubail)
Client / ownerSaudi Aramco
ValueUSD 10bn+ (press estimate)
Announced08 Nov 2026
Project typeOil, gas & petrochemical plants

Trades and packages needed

What to do

Early stage – get on the client's or bidders' vendor lists now.

Read the official source → Report a correction

Related live opportunities

Pre-qualification / EOIUnited StatesUSD 1.11bnOpen – deadline not published

Boardwalk Kosciusko Junction Pipeline Project – 103 mi 36-inch loop of Gulf South 42-inch line plus 8 mi Columbia Gulf Lateral, new Kosciusko (51,554 hp) & Holmes compressor stations, Isola expansion, 4 M&R stations (1.175 MMDth/d); FERC staff authorised construction 6 Nov 2026

Client: Gulf South Pipeline Co. / Texas Gas Transmission (Boardwalk Pipelines)

Contract awardPolandPLN 1.1bn (PLN 712.6M + EUR 109.2M net)Contract awarded – subcontracting open

Łódź EC4 energy recovery plant (ZOE) – thermal treatment of ~200,000 t/yr pre-RDF, 36-month build; consortium selected as most advantageous offer

Awarded to Budimex (49.2%) / Keppel Seghers Belgium · Client: Veolia Energia Polska

Open tenderLebanon · لبنانOpen – closes 19 Jan 2027 (70 days)

EDL rehabilitation of gas (fuel) storage depot at Nahr Road site – public tender 52/2026, 3-month execution

Client: Électricité du Liban (EDL)

Pre-qualification / EOIBahrain · البحرينUSD 1.5BOpen – deadline not published

Sitra IWPP (~1,200 MW CCGT + 30 MIGD desalination, BOO, est. USD 1.5bn) – nearing award; Acwa lowest first-year tariff vs Taqa

Client: Electricity & Water Authority (EWA), Bahrain

Contract awardQatar · قطرContract awarded – subcontracting open

Maydan Mahzam offshore field redevelopment – detail design for three major topsides, four jackets and brownfield tie-ins (LoA from PTSC M&C)

Awarded to Aker Solutions · Client: PTSC Mechanical & Construction (for QatarEnergy)