Argentina LNG – line-pipe supply tender (~USD 2bn) for two 48-inch gas pipelines + 24-inch polyduct, 527 km Vaca Muerta–Sierra Grande; bids taken 20 Oct by reverse auction, FID targeted 26 Nov
تأهيل مسبق – Argentina
Large-diameter line-pipe mills, coating, inspection and pipe-logistics firms should track this USD 2bn pipe award for Argentina's largest gas export pipeline ahead of the November FID.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Argentina · Neuquén – Sierra Grande (Río Negro) |
| Client / owner | Argentina LNG consortium (YPF, Eni, XRG) |
| Value | USD 2,000M (est.) |
| Announced | 19 Oct 2026 |
| Project type | Pipelines & utility networks, Oil, gas & petrochemical plants |
Trades and packages needed
- Pipes, valves & fittings supply (main package)
- Steel, rebar & structural sections supply
- Industrial blasting, coating & painting
- NDT, inspection & certification
- Construction logistics, freight & customs
What to do
Early stage – get on the client's or bidders' vendor lists now.