Ashghal re-awards remaining works on 8 delayed roads & infrastructure projects (6 residential-area road packages, Al Shahhaniya main sewer to Doha North STW, Orbital Highway TSE pipeline)
هيئة الأشغال العامة (أشغال) تعيد ترسية الأعمال المتبقية في 8 مشاريع طرق وبنية تحتية متأخرة (6 حزم طرق سكنية، خط الصرف الرئيسي من الشحانية إلى محطة الدوحة الشمالية، وخط مياه الصرف المعالجة على الطريق المداري)
Ashghal has handed the remaining works on eight stalled road, sewer and TSE projects (~6,360 plots) to new contractors; asphalt, utility-network, drainage and lighting subcontractors and pipe suppliers should approach the incoming main contractors.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Qatar · Al Kharaitiyat / Al Kheesa / Al Meshaf / Muaither / Umm Slal / Al Sheehaniya |
| Client / owner | Public Works Authority (Ashghal) |
| Awarded to | New contractors (not named) |
| Announced | 08 Oct 2026 |
| Project type | Roads & highways, Wastewater & sewage |
Trades and packages needed
- Roads, asphalt paving & road marking (main package)
- Water, sewer & utility networks (incl. HDD) (main package)
- Storm-water drainage & culverts (main package)
- Earthworks, excavation & site grading
- Street, area & sports lighting
- Ready-mix concrete, cement & aggregates
- Pipes, valves & fittings supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.