ATTRAPI FP-09-JZO-009JZO001-I-2-2026 – design & construction of at-grade Moctezuma station and auxiliary building(s) (inspection zone), Tramo V San Luis Potosí–Charcas (km 194+500–365+138), Querétaro–Saltillo passenger train; 1,460 days
مناقصة – Mexico
Building contractors with station design capability, MEP and finishing subcontractors: international tender for a rail station and auxiliary building on the Querétaro–Saltillo line, bids open 14 Dec 2026.
| Type | Open tender |
|---|---|
| Status | Open – closes 14 Dec 2026 (34 days) |
| Country | Mexico · Moctezuma, San Luis Potosí |
| Client / owner | Agencia de Trenes y Transporte Público Integrado (ATTRAPI) |
| Announced | 06 Nov 2026 |
| Deadline | 14 Dec 2026 |
| Project type | Rail & metro |
Trades and packages needed
- Architecture & design (main package)
- Concrete works (in-situ) (main package)
- Structural & civil design
- Structural steel fabrication & erection
- Roofing & sheeting
- Electrical installation (LV)
- Plumbing & sanitary
- Fire protection & fire alarm
- ELV, ICT & security systems (CCTV, access, cabling)
- Flooring, tiling & stone
What to do
Register with the client and request the tender documents before the deadline.