Central Coast Blue Advanced Water Purification Facility – design-build (UF, 3-stage RO, UV-AOP, injection well), ~750 AFY
ترسية عقد – United States
Membrane, RO and UV-AOP equipment vendors plus civil and E&I subcontractors should contact PERC Water ahead of the spring 2027 construction start.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | United States · Pismo Beach, California |
| Client / owner | City of Pismo Beach |
| Awarded to | PERC Water Corporation (Consolidated Water Co.) |
| Value | USD 39.8M |
| Announced | 12 Oct 2026 |
| Project type | Water, desalination & treatment |
Trades and packages needed
- Water & wastewater treatment equipment (main package)
- HVAC, pumps & mechanical equipment supply (main package)
- Process piping fabrication & welding
- Concrete works (in-situ)
- Electrical & instrumentation (E&I) installation
- BMS, controls & SCADA
- Water, sewer & utility networks (incl. HDD)
- Pipes, valves & fittings supply
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.