CFE-0001-CAAAT-0180-2026 – supply, removal and installation of steam generator (HRSG) walls and economizer side walls, Unit 4, Central Ciclo Combinado Valle de México
مناقصة – Mexico
Boiler/HRSG fabricators, pressure-part welding and power-plant outage contractors: CFE tender to replace steam-generator and economizer walls on a combined-cycle unit, opening 12 Nov 2026.
| Type | Open tender |
|---|---|
| Status | Open – closes 12 Nov 2026 (2 days) |
| Country | Mexico · Valle de México combined-cycle plant, State of Mexico |
| Client / owner | CFE – Gerencia de Abastecimientos |
| Announced | 23 Oct 2026 |
| Deadline | 12 Nov 2026 |
| Project type | Power plants & renewables |
Trades and packages needed
- Pressure vessels, tanks & heat exchangers (main package)
- Process piping fabrication & welding (main package)
- Mechanical erection & equipment installation (main package)
- Shutdown, turnaround & plant maintenance (main package)
- NDT, inspection & certification
- Scaffolding & access
- Heavy lifting, rigging & transport
What to do
Register with the client and request the tender documents before the deadline.