Climate-resilient long-span bridges & link roads – Lot 1 Kabba, design & build of two bridges, SL-MTA-TIDU-471342-CW-RFP (World Bank)
ترسية عقد – Sierra Leone
USD 24M design-build award (30 months) – steel, piling, design and road-paving subcontractors can approach the Matière/SECON JV.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Sierra Leone · Kabba |
| Client / owner | Sierra Leone Connectivity and Agricultural Market Infrastructure Project (Ministry of Transport & Aviation) |
| Awarded to | MATIERE/SECON (JV) |
| Value | USD 24.2M |
| Announced | 07 Oct 2026 |
| Project type | Bridges & tunnels, Roads & highways |
Trades and packages needed
- Bridge & flyover construction (main package)
- Structural & civil design (main package)
- Structural steel fabrication & erection (main package)
- Roads, asphalt paving & road marking (main package)
- Piling & deep foundations
- Concrete works (in-situ)
- Steel, rebar & structural sections supply
- Equipment & crane rental
- Land surveying & geotechnical investigation
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.