Climate-resilient long-span bridges & link roads – Lot 2 Komrabai, design & build of two bridges, SL-MTA-TIDU-471342-CW-RFP (World Bank)
ترسية عقد – Sierra Leone
USD 20.7M design-build bridge award (30 months) – material suppliers, steelwork and testing firms can approach China Railway Seventh Group.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Sierra Leone · Komrabai |
| Client / owner | Sierra Leone Connectivity and Agricultural Market Infrastructure Project (Ministry of Transport & Aviation) |
| Awarded to | China Railway Seventh Group Co Ltd |
| Value | USD 20.7M |
| Announced | 07 Oct 2026 |
| Project type | Bridges & tunnels, Roads & highways |
Trades and packages needed
- Bridge & flyover construction (main package)
- Structural & civil design (main package)
- Structural steel fabrication & erection (main package)
- Roads, asphalt paving & road marking (main package)
- Piling & deep foundations
- Concrete works (in-situ)
- Steel, rebar & structural sections supply
- Ready-mix concrete, cement & aggregates
- Land surveying & geotechnical investigation
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.