Coordinador Eléctrico Nacional transmission tender – 17 expansion-plan projects (10 groups) awarded to Celeo, Engie, Transemel, Alupar, Cox Chile and Ferrovial; incl. Celeo's 6 new substations + two 2x66 kV lines
ترسية عقد – Chile
Substation EPC subcontractors, transformer/switchgear suppliers and line builders should approach the six winning transmission companies for Chile's 17 new grid projects due 2031.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Chile · Biobío, Coquimbo, O'Higgins and other regions |
| Client / owner | Coordinador Eléctrico Nacional (CEN) |
| Awarded to | Celeo (3 groups, ~USD 200M); Engie (3); Transemel (1); Alupar (1); Cox Chile (1); Ferrovial (1) |
| Value | USD 475M |
| Announced | 05 Nov 2026 |
| Project type | Substations & transmission grids |
Trades and packages needed
- MV/HV substations & transmission lines (main package)
- Cables, switchgear & electrical materials (main package)
- Structural steel fabrication & erection
- Concrete works (in-situ)
- Earthworks, excavation & site grading
- BMS, controls & SCADA
- Land surveying & geotechnical investigation
- MEP & process design engineering
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.