Dangote Group – planned petroleum products pipeline and tank farms on the Djibouti–Addis Ababa corridor (plus proposed Zimbabwe–Zambia corridor) under USD 50bn 2026–2030 plan
تأهيل مسبق – Ethiopia
Early-stage Dangote cross-border fuel pipeline and storage plans for Ethiopia/Djibouti; pipeline EPC, tank fabricators and design consultants should position early.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Ethiopia · Djibouti–Addis Ababa corridor |
| Client / owner | Dangote Group |
| Announced | 22 Oct 2026 |
| Project type | Pipelines & utility networks, Oil, gas & petrochemical plants |
Trades and packages needed
- Pipeline construction (main package)
- Pressure vessels, tanks & heat exchangers (main package)
- Process piping fabrication & welding
- Cathodic protection
- NDT, inspection & certification
- MEP & process design engineering
- Land surveying & geotechnical investigation
- Pipes, valves & fittings supply
What to do
Early stage – get on the client's or bidders' vendor lists now.