Dar es Salaam BRT Phase 4 – drainage structures for flood mitigation at Boko Basihaya (14 months), TZ-TANROADS-534896-CW-RFB (World Bank)
ترسية عقد – Tanzania
Precast-culvert, ready-mix and dewatering suppliers in Dar es Salaam can approach China Gezhouba on its TZS 59.5bn BRT Phase 4 flood-drainage contract.
| Type | Contract award |
|---|---|
| Status | Contract awarded – subcontracting open |
| Country | Tanzania · Dar es Salaam |
| Client / owner | Dar es Salaam Urban Transport Improvement Project (DUTP) – TANROADS |
| Awarded to | China Gezhouba Group Company Limited |
| Value | TZS 59,490M |
| Announced | 23 Oct 2026 |
| Project type | Roads & highways, Wastewater & sewage |
Trades and packages needed
- Storm-water drainage & culverts (main package)
- Precast & prestressed concrete (main package)
- Earthworks, excavation & site grading (main package)
- Ready-mix concrete, cement & aggregates (main package)
- Concrete works (in-situ)
- Dewatering
- Steel, rebar & structural sections supply
- Equipment & crane rental
What to do
The contract has been awarded. The winner will now buy materials and subcontract packages – contact their procurement team.