Deep tunnel stormwater system – study and preliminary design (limited tender request; CAPT decision deferred)
نظام النفق العميق لتصريف مياه الأمطار – دراسة وتصميم مبدئي (طلب مناقصة محدودة؛ تأجيل قرار الجهاز المركزي للمناقصات)
Tunnelling and drainage design consultancies should prepare for a limited MPW tender for Kuwait's deep stormwater tunnel study once CAPT approves it.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Kuwait · Kuwait City |
| Client / owner | Ministry of Public Works (MPW), Kuwait |
| Announced | 04 Nov 2026 |
| Project type | Bridges & tunnels, Wastewater & sewage, Pipelines & utility networks |
Trades and packages needed
- Structural & civil design (main package)
- Land surveying & geotechnical investigation (main package)
- MEP & process design engineering
What to do
Early stage – get on the client's or bidders' vendor lists now.