Vía de Evitamiento Chimbote – final engineering design (EDI) for grade-separated crossings, pedestrian footbridges, connector roads and four bridges (Vesique, Buenos Aires, Santa, Campo Nuevo ovals); 12-month study
تأهيل مسبق – Peru
Road and bridge design consultancies and geotechnical firms should approach concessionaire AUNOR for the Chimbote bypass interchange design; construction packages follow.
| Type | Pre-qualification / EOI |
|---|---|
| Status | Open – deadline not published |
| Country | Peru · Chimbote, Áncash |
| Client / owner | MTC – Dirección General de Programas y Proyectos de Transportes |
| Parties | Autopista del Norte S.A.C. (AUNOR, concessionaire) |
| Announced | 04 Nov 2026 |
| Project type | Roads & highways, Bridges & tunnels |
Trades and packages needed
- Structural & civil design (main package)
- Land surveying & geotechnical investigation (main package)
- Bridge & flyover construction
What to do
Early stage – get on the client's or bidders' vendor lists now.